Hilton Tallinn Park case study
|
|
|
Contents |
[edit] Introduction
The Hilton Tallinn Park, Estonia is a landmark hotel striving towards more sustainable performance. By following BREEAM In-Use, the project management team could adhere to a clear system to help them evaluate the existing building and compare it with best practices to support a sustainable renovation.
[edit] Building specifics
The building is located in the city centre of Tallinn, Estonia. It was built on a previously developed plot. The previous structures were dismantled and the new building was built from 2014 to 2016.
The building has 11 above ground floor levels and one below ground parking floor. The total floor area is close to 20,000 m2. The dominant use of the building is hotel rooms on floors 3 to 11. The second largest occupant is a casino located at ground floor level.
The current main tenant Hilton is aspiring to fulfil increasing demand from clients for more sustainable buildings to stay in or organise conferences in. For that reason, the current BREEAM In-Use Part 1 certification can be considered the first step to improve building performance. It is hoped that Part 2 certification will be applied for and achieved.
[edit] Green Strategy
The client’s wish was to certify the building to the highest certification level possible. The aim from the beginning was to reach a rating of at least ‘Very Good’. Using BREEAM In-Use the client got an insight into how to achieve a high quality and sustainable building.
Even though the building is recently built, there were quite a few issues in different categories that were not clearly covered by project documentation. To overcome obstacles, a couple of additional surveys and audits were conducted to identify the actual situation.
[edit] Energy highlights
The building has a very large proportion of windows and a reasonably narrow floor plan, allowing high daylight levels. Hotel clients are able to regulate thermal comfort in their rooms. Guests are able to adjust heating and cooling as well as modifying the air speed.
The building is equipped with a heating system less than five years old along with cooling and mechanical ventilation equipment. The building is connected to a district heating network with high heat source efficiency. Some areas of the building have occupancy sensor-controlled lighting which helps to avoid unnecessary energy use when not needed.
The building is located very close to the city centre with excellent access to public transport and several amenities in walking distance. Employees have the opportunity to commute with bicycles; there are secure bicycle parking spaces as well as changing and showering facilities.
The building’s water consumption is measured and measurements are accessible through BMS. The building is equipped with water efficient dual-flush WCs. All urinals in the building are water efficient and controlled by PIR sensors which, in combination, guarantee low water consumption. The conference rooms' large toilet areas are equipped with water efficient contactless hand washing fixtures.
Building security systems have been designed according to local best practices. The installed security system is certified according to international security standards. The building is in an area where no natural hazards are present.
There are four separate waste containers to collect four types of recyclable waste streams. Additionally, batteries and light bulbs are collected separately to avoid disposal at landfill stations.
The landscaping contains grassed areas and trees around the asset.
[edit] Engineering assessment
Jüri Padisaar a chief engineer at Hilton Tallinn Park feels the outcome has been beneficial for Hilton, a global player in the hospitality market. He explains, "Clients are becoming more aware of the sustainability and are more interested in the steps that companies take to make a change in their everyday procedures. To be able to show our clients the efforts that the company goes through to make the hospitality a more eco-friendly business puts us in a better position to secure new business; it also makes us proud to make an effort to show kindness towards nature.”
This article originally appeared on the BREEAM website. It was published in August 2020.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
Plumbing and heating for sustainability in new properties
Technical Engineer runs through changes in regulations, innovations in materials, and product systems.
Awareness of the Carbon Border Adjustment Mechanism
What CBAM is and what to do about it.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.